1126 MW. Adani Khavda, Gujarat, India — what's behind it?
4 gigawatt-hours. In one battery. Adani Khavda, Gujarat, India: 1126 MW, Adani Green Energy Ltd (AGEL) in Khavda, Gujarat, Indien. From Stromfee Battery Energy

What's behind it
3.37 GWh — 1,126 MW — built in 10 months. World record outside China.

Location & Technology
Operator: Adani Green Energy Ltd (AGEL)
Location: Khavda, Gujarat, Indien
Power: 1126 MW · Energy: 3.37 GWh
Weltgrößte Einzelstandort-BESS außerhalb Chinas bei Inbetriebnahme. Co-located mit 30-GW-Khavda-Renewable-Park im Rann of Kutch. In 10 Monaten errichtet.

Stromfee Take
This is where the lever sits: Transparent HVAC with Stromfee AI. We make every inverter, every cell, every register visible — container to single cell. At this scale, 5–15% HVAC savings is industry standard. Plus the BESS Optimizer: power-market revenue + peak shaving + backup in one.

Stromfee apps in your language: stromfee.app (DE · EN · ES · FR)