HomeBlog

182.5 MW. PG&E Elkhorn Battery, Moss Landing, California — what's behind it?

4 gigawatt-hours. In one battery. PG&E Elkhorn Battery, Moss Landing, California: 182.5 MW, PG&E in Moss Landing, Monterey County, Kalifornien, USA. From Stromf

PG&E Elkhorn Battery, Moss Landing, California
Concept illustration (AI, FLUX·2): PG&E Elkhorn Battery, Moss Landing, California

What's behind it

256 Tesla Megapacks — undamaged but offline since the fire next door. Storage safety in focus.

Concept illustration (AI, FLUX·2): Site architecture

Location & Technology

Operator: PG&E
Location: Moss Landing, Monterey County, Kalifornien, USA
Power: 182.5 MW · Energy: 0.73 GWh

Physisch unbeschädigt durch Brand. 256 Tesla Megapacks auf 33 Betonsockeln am Moss Landing Umspannwerk. Automatischer Sicherheits-Shutdown nach Vistra-Brand. PG&E plant Wiederinbetriebnahme.

🎬 Full explainer — all 25 spots, every figure sourced:
Concept illustration (AI, FLUX·2): Infrastructure detail

Stromfee Take

This is where the lever sits: Transparent HVAC with Stromfee AI. We make every inverter, every cell, every register visible — container to single cell. At this scale, 5–15% HVAC savings is industry standard. Plus the BESS Optimizer: power-market revenue + peak shaving + backup in one.

Concept illustration (AI, FLUX·2): Theme image
→ Test Stromfee transparent HVAC

Stromfee apps in your language: stromfee.app (DE · EN · ES · FR)

Sources