4 MW. Southside Festival — what's behind it?
25 megawatts. Just for the main stage. Southside Festival: MW, in Neuhausen ob Eck, Germany. From Stromfee Music Festivals report.

What's behind it
65,000 fans, 4 MW — and one BESS container could replace the generators.

Location & Technology
Operator:
Location: Neuhausen ob Eck, Germany
Power: MW

Stromfee Take
This is where the lever sits: Transparent HVAC with Stromfee AI. We make every inverter, every cell, every register visible — container to single cell. At this scale, 5–15% HVAC savings is industry standard. Plus the BESS Optimizer: power-market revenue + peak shaving + backup in one.

Stromfee apps in your language: stromfee.app (DE · EN · ES · FR)