6 MW. Download Festival — what's behind it?
25 megawatts. Just for the main stage. Download Festival: MW, in Castle Donington (Donington Park), UK. From Stromfee Music Festivals report.

What's behind it
75,000 metalheads in Donington Park — 100% HVO fuel, not a fossil drop.

Location & Technology
Operator:
Location: Castle Donington (Donington Park), UK
Power: MW

Stromfee Take
This is where the lever sits: Transparent HVAC with Stromfee AI. We make every inverter, every cell, every register visible — container to single cell. At this scale, 5–15% HVAC savings is industry standard. Plus the BESS Optimizer: power-market revenue + peak shaving + backup in one.

Stromfee apps in your language: stromfee.app (DE · EN · ES · FR)